Ventilation Planning and Design of the Omerler B MineIdejno rešenje ventilacije rudnika Omerler B
Underground Mining Еngineering, Review paper [pdf]Podzemni radovi, Pregledni rad [pdf]
ID: 2.2012.21.6 Number: 20 Volume: XX Month: 12 Year: 2012 UDC: 62 [tmx] [bow]
Nikola Lilić
Institution: University in Belgrade, Faculty of Mining and Geology, Belgrade
Mail: lilic@rgf.bg.ac.rs
Nikola Lilić
Institucija: Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd
E-pošta: lilic@rgf.bg.ac.rs
Vojin Čokorilo
Institution: University in Belgrade, Faculty of Mining and Geology, Belgrade
Mail: cokorilo@rgf.bg.ac.rs
Vojin Čokorilo
Institucija: Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd
E-pošta: cokorilo@rgf.bg.ac.rs
Aleksandar Cvjetić
Institution: University in Belgrade, Faculty of Mining and Geology, Belgrade
Mail: alex@rgf.bg.ac.rs
Aleksandar Cvjetić
Institucija: Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd
E-pošta: alex@rgf.bg.ac.rs
Vladimir Milisavljević
Institution: University in Belgrade, Faculty of Mining and Geology, Belgrade
Mail: milisavljevic@rgf.bg.ac.rs
Vladimir Milisavljević
Institucija: Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd
E-pošta: milisavljevic@rgf.bg.ac.rs
Abstract
This paper describes a case study for the ventilation planning at TKI Company's Omerler B Mine in Tuncbilek coal basin which is located in Kutahya region in central Turkey The Omerler B mine will comprise of two mechanized longwall coal mining operations and single manual longwall for annual production of approx. 1.6 mtpa of coal. Future ventilation system for the mine operations was determined by establishing ventilation model developed from data collected during a site visit. The paper discusses the challenge to coordinate necessary ventilation requirements with long-term demands. A diagonal mine ventilation system configuration was recommended based on the results of the network modeling exercise of the various options. The scope of the configuration changes, and the improvement resulting from these changes is discussed.
Apstrakt
U ovom radu je opisano rešenje ventilacije rudnika Omerler B u ugljenom basenu Tuncbilek u regiji Kuthaya u centralnoj Turskoj, a koje je u vlasništvu kompanije TKI. Eksploatacija uglja u rudniku Omerler B će se vršiti sa dva širokočelna mehanizovana kompleksa, uz godišnju proizvodnju od oko 1,6 miliona tona rovnog uglja. Sistem ventilacije je definisan uz pomoć ventilacionog modela, razvijenog na osnovu prikupljenih podataka. U radu su prikazani rezultati analize ventilacije rudnika u cilju određivanja potrebnih dugoročnih uslova provetravanja rudnika Omerler B. Preporučeno je da se usvoji dijagonalni sistem ventilacije, a na osnovu rezultata modeliranja ventilacionih mreža različitih opcija. Takođe, razmotrene su različite promene konfiguracije ventilacione mreže i analizirani su njihovi rezultati.
Keywords: mine ventilation, underground longwall coal miningKljučne reči: ventilacija rudnika, mehanizovano otkopavanje uglja širokim čelima
Pages: 121-130Strane: 33-42